1.1
Introduction
To
develop a Web based Sales Order Processing and Tracking System for Quizz
sportswear Inc.
Process
map activities followed in Quizz sportswear are as follows
- Logistics/
Sales / CFA
- Production
/ Quality / Plan
- Merchandising
/ Stores / Supplier / Logistics
Process
map activities are mainly divided into following phases
- Line
Planning
- Line
Finalisation
- Production
Planning
Quizz
sportswear has one major mode of Order Booking and Processing
- Make
To Order Methodology
The products involved are branded products wherein the Quizz sportswear
carries out the Make To Order methodology for its own brands and for brands
of other companies.
For
the Own brands -
For The own brands Make To Order methodology is followed:
·
- Mother
warehouses,
-
Service warehouses or Retailers run out of stock due to sudden demands
and
- Special
efforts have to be put in to ensure supplies are made available to such
point of sales.
For
the other brands -
For
brands of other companies Make to Order methodology is also followed:
- As
customer comes in company with specific requirements for which no previous
data may be available. (i.e. the customer is essentially an unplanned
incident)
1.2
Features
Quizz sportswear has one major mode of Order Booking and Processing
- Make
To Order Methodology
As
order is booked after the following preliminary exercises are carried
out
- Specifications
for the garment come from the customer where the reference is to garments
already manufactured earlier.
- Specifications
for the garment come from the retailers where the reference is to the
products already manufactured
earlier.
- Raw
Material availability and procurement lead-time.
- Finances
- Distribution
and Marketing Logistics
- Capacity
for Production
- Outsourcing
/ Job Working production activities
- Costs
for Outsourcing / Job Working Production activities
a.After
booking of the order, Purchase orders for the various Raw material components
are released on the vendor. Such as fabric suppliers and other vendors.
b.At
Goods Receipt quality checks are carried out and rectification of Quality
defects are followed up. Then Raw Materials are issued to Production
c.Before
the production is carried out as part of the Planning process, production
capacity and capability, resource allocation, targets etc. are determined.
Raw Material from stores is issued to production. Production activities
are carried out. Confirmation of various activities is reports to the
system. (e.g. of Activities are as Fabric Checking, Layering, Cutting,
Stitching, Buttoning, Washing, Ironing, Packing)
At each stage of the production activities, quality checks are carried
out.
d.For
those activities which are the entrusted to outside job working quality
checking and production monitoring is also carried out.
e.The
finished and packed garments are transferred to the finished goods stock.
f.Shipment
activities are carried out from the Finished Goods Stock.
g.Shipment
/ Dispatch Logistics-The two major modes of deliveries are to
I. Mother Warehouse - These are central warehouses from where further
distribution can be carried out.
II. Service Warehouse - These are local Warehouse smaller than
Mother Warehouse from where distribution to retailers is carried out.
III. Retailers (Point of Sale) - Deliveries to retailers are dispatched
from service and or Mother Warehouse.
1.3
Development Strategy adopted: -
1.
System Study
2.
Analysis and Design
- High
Level Design
- Low
Level Design
3.
Coding
4.
Testing
- Integration
Testing
- System
Testing
5.
User Acceptance and Training
1.4 Tools and Technologies adopted: -
OS
- Windows
2000 Advanced Server
Services
- SQL
Server 7.0
- IIS
5.0 Web Service
Technologies
- Visual
Basic 6.0(RAD Tools)
- Active
Server Pages 3.0 (ASP)
- Visual
Basic for Application (Excel and Access)
- Visual
Basic Script (Script Components)
- Open
Database Connectivity
- ActiveX
Data Objects
Components Developed
1.Title Dbcom
-
Visual Basic 6.0 (dll),
-
ActiveX Data Object,
- ODBC
Description
:This in-process COM component (ActiveX Dll) gives a functionality
to provide DSN-less connection to MS SQL Server, Oracle, and MS Access
databases. Its takes Table or View or Store Procedure with or without
arguments returns a ADO Recordset back to the client using ActiveX Data
Objects (ADO).
2
Title Cwords
- Visual
Basic 6.0 (dll)
- Description
To convert numerical amount into words and Currency interchange
3. Title Tax Component
- Visual
C++ 6.0 Using Active Template Library (ActiveX .ocx)
- Description
To Calculate compound interest and Salary Deduction based on Tax.
4. Title Date Checker
- Visual
C++ 6.0 Using Active Template Library (ATL) (ActiveX dll)
- Description
To Validate User input Date based on Leap Year Calculation.
5 Effort/Duration Estimate
- Duration
Estimate = 10 calendar months
- Effort
Estimate = 726 man-days
- Total
Resources Required: 10
|